s
   
  Break Bulk
   
  Project Cargo
   
  Bulk
   
  Grains
   
  Coal
   
  Tankers
   
  Lines
   
  Offshore

Barranquilla

 

Cementos del Caribe

 

→ Max. Draft Alongside: 29 feet f.w.

→ Max. Loa: this restriction has not been determined but the terminal is recommended to bring vessels up to 185 mtrs long.

→ Max. Beam: not determined but depends on draft restriction.

→ Max. Airdraft: about 13 mtrs from water lebel to hatch top.

→ Loading System/Rate for Bulk Cargo: about 6,000 mt/day agw/wp with ship´s cranes and about 2,000 mt/day agw/wp with conveyor belt

→ Loading System/Rate for Bagged Cement: about 1,500 mt/day agw/wp using ship´s cranes

→ Discharging System/Rate for Bulk Cargo: about 4,000 – 5,000 mt/day agw/wp

→ Normal Working Hours: 24 hrs shinc

→ Security Measurements: it is compulsory the watchmen service on board during vessel´s stay at the dock. This service is for vessel´s account. Also is not allowed the crew´s disembarking during vessel´s stay at port


According to shippers, ths use of conveyor belt for loading coal operations depends on coal grade and some types of vessels that cann be loaded from the aft holds to fwd holds, as this conveyor is not mobile and they loose a lot of time during shifting maneuvers. Shippers estimate each shifting maneuver takes about 2 hours.

 

Colterminales

 

→ Max Draft: the same as the river mouth and navigational channel

→ Max Loa: not determined but have docked vessels with loa up to 190 meters long.

→ Max Beam: not determined but depends on loa and draft restriction.

→ Hose Connections: there are 5x 6” connections and 4 x 4” connections and 1x8” connection, as well. This terminal has connections to another private tanks for receivers, which require discharging cargo directly to their port premises. Shippers usually load from their private tanks connected to the colterminales pipelines for vessel’s loading operations.

→ Shore Tanks Distance from Manifold: about 150 mtr

→ Elevation of Tanks: about 10 mtrs

→ Storage Capacity: about 21332 m3.

→ Gangway Used: shore.

→ Normal Working Hours: 24 hours shinc.



Sometimes pilot may request a second tugboat for berthing/unberthing maneuvers for vessels with loa less than 150 meters as the current river is very strong in this area.

The replenishment of bunkers or fresh water are carried ot through barges, as the pier structure does not allow the supply with trucks directly. In case of bunkering the vessel via trucks they must use terminal lines for connecting with the vessel. Bunkering delivery by trucks or by barges thru the river has a surcharge by terminal, which is at usd 10.30 per m/t. Please confirm this extra cost with your broker prior fixing the bunkering. Please note ifo bunker is not able to supply thru pipelines but to barges only.

 


 
 
  Bogotá Buenaventura Santamarta Cartagena
         
  Medellín Turbo Puerto Bolívar Barranquilla
         
 
 
Desarrollado por IMAGINE S.A.